CL - Voelcker: A selection of Case StudiesHarwell Western Storage Area: remediation strategies, risk assessments, operational envelopes and the Waste Management Plan. Newbury: Former Fuel Transfer Depot : strategy for the remediation of the site Environmental Impact Assessment (EIA) for the planned redevelopment of the town centre of Shirley. Caythorpe Gas Storage Facility : We have been working with Warwick Energy Ltd to produce and submit the IPPC application to the Environment Agency for change in activities from gas extraction to gas storage. Stonehenge: Environmental Impact Assessment (EIA) for the planned redevelopment of the Visitor Centre at Stonehenge BlueWater / Waterstone Park: We have been involved with the site since 2004 providing a range of specialist geotechnical design and consultancy services particularly related to the properties and features of the underlying Chalk. Major housing site in Surrey for Linden Homes: Our involvement has included high level interaction with the client on a wide range of specialist geotechnical and environmental issues. Former Battery Factory: We have been involved with the last operator, Yuasa Batteries, from the early stages of their divestment programme advising on matters of land contamination and ground conditions. The Hub - Birmingham: Appointed by Fropus (Lion Park) Ltd, as geoenvironmental consultants on this 38ha site to carry out a complete site investigation and geoenvironmental study. Lambton Coke Works: We are partnering the main contractor on the reclamation and remediation of a 65ha former colliery, brick and coke works site at Lambton near Sunderland. Stonefoot Disposal Site : Following the Foot and Mouth Disease (FMD) outbreak in 2001 CL Voelcker were instructed to carry out a Ground Investigation at the former Stonefoot Colliery site
|